日治八通關越嶺步道系統安全評估暨規劃委託案

Contracted Safety Assessment and Safety Planning for the Colonial-Era Batongguan Trail System
中文摘要
本計畫根據文獻分析與現場調查結果,進行八通關越嶺步道各項軟硬體檢視及規劃,完成以下工作項目:
1. 重新檢測既有牌示、設施、避難點、水源地、叉路、里程、坡度變化與重要資源,研擬步道管理計畫。
2. 針對步道崩塌路線重新勘查並評估相對安全之登山步道,研擬後續經營管理建議。
3. 針對多美麗駁坎牆及意西拉鐵線橋等重要文化資源提出緊急處理方案。
英文摘要
The present project conducted field inspections of the ‘hard’ and ‘soft’ infrastructures that are associated with the Batongguan Traversing Trail and proposed plans for related improvements. These activities were based on a careful analysis of available reference materials and on the results of project-related site investigations. Activities completed for this project include:
1. Revisit and assess current signage, facilities, shelters, water sources, branch trails, distance markers, slope changes, and other critical assets. Develop and draft an appropriate trail-management plan.
2. Investigate collapsed trail sections and scout out relatively safe alternative routes that avoid / circumvent these sections. Develop and draft related management regulations for these higher-risk areas.
3. Propose emergency measures for managing critical cultural assets, including the stone wall at Duomeili Station and Yisila Suspension Bridge.
基本資料
  • 計畫編號: 106-17
  • 辦理方式: 委託辦理
  • 主管機關: 玉山國家公園管理處
  • 計畫期間: 106年1月12日起至106年12月31日止
  • 執行機關: 米亞桑戶外國際有限公司
  • 年度: 106
  • 計畫經費: 新臺幣940,000元
  • 領域: 理學
  • 主持人: 張嘉榮
  • 中文關鍵字: 八通關越嶺步道、步道系統安全評估、步道分級與管理
  • 英文關鍵字:Batongguan Traversing Trail, trail system safety assessment, trail classification and management